Introduction to the Manual The Capital Planning Manual outlines the Ministry of Health's capital planning process, policies and procedures for capital projects. How the Manual is Organized Listed below are the nine sections of the manual: About the Manual Overview of the Capital Planning Process Stage 1: Proposal Stage 2: Functional Program. · These technical standards are set of documented requirements for materials, equip-ment, and construction systems, as well as standards for products, workmanship, and the construction services required to produce the work. All specifications submitted to Harvard University for capital projects should adhere to the guidelines set forth by the. This manual should be read in conjunction with the appropriate Design Standard and/or Technical Manual for the type of asset being delivered. The Design Standards and Technical Manuals related to reticulation works include but are not limited to.
The PDS consists of a Plan Submission, PDS Text Submission, a PDS Quality Checklist and Designer’s Certification, a Preliminary Construction Cost Estimate, and the Design Communications Report (DCR). Preliminary Design Submission (PDS) Requirements 1. Plan Submissions - The content of the plan submission will vary depending upon the. School Capital Manual | March 7 Who to Contact Education Capital Planning Sector helps with: capital planning - capital funding requests - approved capital projects and budgets - project design - projects funded through Infrastructure Maintenance and Renewal (IMR) - development of capital plans Contacts. The usual heating, ventilating and air conditioning work, including controls 2. Boilers, breaching and incidental piping, heaters and pumps 3. Site distribution of steam, condensate, hot water, and chilled water (tunnels are under the GC Contract) 4. Heating work for control buildings of sewage treatment plants 5.
the Ministry / LHIN Accountability Agreement, which requires local needs and LHIN advice to be considered in the review of capital planning submissions. Stress Tests and Capital Planning HSBC North America Holdings, Inc. (PDF) 76, No. / Wednesday, September 7, (PDF). May Reporting requirements applicable to minor investments will be covered in the Manual Facility construction and repair projects undergo two.
0コメント